Your clinic needs a fire NOC when its building or its use crosses the limits in your state's fire rules. This is also called a fire safety certificate. The National Building Code (NBC) 2016 draws two lines. Hospitals and nursing homes with beds start at 9 metres. Every other building starts at 15 metres. Both numbers you see online are right. They are for different buildings.
Not legal advice. VisiDx does not issue or arrange fire certificates. Your state fire service decides.
Why the 9 m and 15 m answers clash
Pages that rank for this question quote one number and drop the rest. Here is what each source says.
| Source | What it says |
|---|---|
| National Building Code 2016, fire chapter | The chapter covers all high-rise buildings. It covers institutional buildings 9 metres and above. It also covers institutional, business and other buildings with over 500 square metres of floor on any floor. And it covers buildings with two basements, or one basement over 500 square metres. |
| National Building Code 2016, high-rise | A high-rise building is 15 metres or above, whatever it is used for. |
| National Building Code 2016, kinds of building | Hospitals and nursing homes are institutional. Doctors' offices and outpatient clinics are in the business group. |
| Delhi fire rules, 2010 | An institutional building is at risk above 9 metres or ground plus two floors. A business building is above 15 metres or ground plus four floors. |
| NABH notice for Delhi, 11 Mar 2025 | Day-care places with no overnight stay are business buildings. Dental clinics and OPDs are examples. Business buildings under 15 metres need no NOC. Nursing homes up to 9 metres, or ground plus one floor, need none. |
| Gujarat fire rules, 13 Dec 2023 | Hospital checks start below 15 metres if there are beds and the floor area is over 500 square metres. Offices and outpatient clinics start above 15 metres, or with a floor area over 500 square metres. |
So the rule has three parts. The first is what the building is used for. The second is its height. The third is its floor area. A clinic with beds is judged like a hospital. An OPD with no beds is judged like an office.
Where Delhi's own sources disagree
Delhi shows how messy this is. Delhi's fire rules list institutional buildings above 9 metres. A 2024 Delhi High Court order records the same reading, as the petitioner's lawyer stated it.
NABH's March 2025 notice says more. It says a nursing home between 9 and 15 metres needs no NOC in one case. The hospital must use only the basement, ground and first floors. The upper floors must be a doctor's home, unused or sealed. NABH is an accreditation body. It is not the fire service.
We cannot settle this for you. Run a nursing home between 9 and 15 metres in Delhi? Ask the Delhi Fire Service in writing. Keep the reply.
Do you need one? A quick check
- Do you admit patients or keep them overnight? If yes, you are institutional (a hospital or nursing home). The line is 9 metres in the NBC and in Delhi.
- Is it OPD only, with no beds? You are a business building. The line is 15 metres in the NBC, Delhi and Gujarat.
- Is the floor area over 500 square metres on any floor? Then the NBC's fire chapter covers your building. Gujarat's table also uses 500 square metres.
- Is there a basement? The NBC counts two basements, or one over 500 square metres.
- Is your clinic inside a taller building? A building of 15 metres or more is high-rise, whatever it is used for. Ask the owner for the building's fire certificate.
If none of these fit, the NBC does not cover your building. Your state or city rules may still ask for a certificate. Local rules win.
What you need
| Item | What the sources say |
|---|---|
| Who applies | The owner or occupier. In a rented clinic, the landlord often holds the building certificate. Ask for a copy. |
| Where | Your state or city fire service. See the portal table below. |
| Papers | They differ by state. Rajasthan's online steps ask for floor plans, an elevation plan, a building photograph, ID proof and a signed affidavit. Gujarat asks for self-certificates on fire equipment upkeep and safe wiring. |
| Agency | Maharashtra needs a certificate from a licensed agency. Gujarat needs a fire safety officer enrolled by the Director. |
| Fee | Each state sets it. Check the portal. |
| Time | In Gujarat, the fire officer has 21 days to examine a complete application. In other states: check. |
| Validity | Gujarat: three years. Delhi: the fire service FAQ says 3 years for non-residential and 5 for residential. Reports say amended Delhi rules make the certificate valid until cancelled, with a yearly Form K declaration. Reports differ on the date. Confirm the rule and any fee on the Delhi Fire Service site. |
These are examples from the states we could read. Do not assume your state is the same.
The steps
- Place your clinic. Use the quick check above. Write down height, floors, floor area, beds and basement.
- Gather the building papers. You need the sanctioned plan and the completion or occupancy certificate. Ask your landlord or builder.
- Fit the basics. NABH's 2022 advice lists the minimum for a healthcare unit:
- fire extinguishers of the right kinds;
- smoke detectors and alarms that are tested and logged;
- lit exit signs and clear exit doors;
- emergency lighting;
- an assembly point for patients and staff;
- mock-drill records.
- Use a licensed person where the state asks. Maharashtra's list of licensed agencies is on mahafireservice.gov.in. Gujarat's fire safety officers are listed on its portal.
- Apply on your state's portal. Use the table below.
- Expect an inspection. Gujarat's rules mention a site visit. Keep your papers and equipment ready.
- Display the certificate and note the renewal date. Maharashtra's law also asks for a maintenance certificate in January and July.
- Run drills. NABH asks for drill records. Gujarat's rules ask the fire safety officer for mock drills twice a year.
State by state
These are the official fire service sites that loaded for us on 30 Oct 2026. For other states, search for your state's fire service and check its page. The "What we read" column is only what we could confirm in an official text.
| State | Official site | What we read |
|---|---|---|
| Delhi | Delhi Fire Service | The 2010 fire rules (above). Reports say amended Delhi rules make the certificate valid until cancelled, with a yearly Form K declaration. Reports differ on the date. Confirm the rule and any fee on the Delhi Fire Service site. |
| Maharashtra | Maharashtra Fire and Emergency Services | Under the state's 2006 fire law, the owner or occupier gives the fire officer a certificate from a licensed agency. They also give a maintenance certificate in January and July. The officer can serve a notice. If it is ignored, the officer can take steps, including sealing. |
| Gujarat | Gujarat Fire Safety Compliance Portal | The 2023 rules make online filing the way to apply. The certificate is valid three years. The rules list which buildings must apply. We did not read that list. |
| Rajasthan | LSG Department, Fire NOC | The Local Self Government Department issues the NOC online. Check its user manual for papers and fees. |
| Uttar Pradesh | UP Fire Services | Check the site for the current online route and limits. |
| Tamil Nadu | TN Fire and Rescue Services | Check the site. A new state fire law is reported for 2025, so older vendor pages may be wrong. |
| West Bengal | WB Fire and Emergency Services | Check the site. |
| Telangana | Telangana Fire Services | Check the site. |
| Bihar | Bihar Fire Service | Check the site. |
| Karnataka | KSFES | Official site per search results. It did not load from our network. Check it. |
| Other states and UTs | Your state fire service | Check your state's site. We did not guess. |
Vendors often quote one flat height rule for "India". The table shows why that is unsafe.
Common mistakes
- Using one number for every clinic. 9 metres is for institutional use. 15 metres is for high-rise and office-type use.
- Counting height the wrong way. The NBC measures from the average ground level to the terrace of the last livable floor.
- Assuming the landlord's certificate covers you. It may cover the building. Ask whether your unit needs its own.
- Treating NABH's third-party certificate as an NOC. NABH says it counts only for accreditation. It does not free you from the fire NOC the law asks for.
- Letting it lapse. Note your renewal date. Gujarat's rules also ask for yearly declarations.
- Mixing it up with other IDs. An HFR ID is not a fire certificate. See HFR registration steps.
- Forgetting the other two papers. Registering offices may ask for a fire certificate and a waste authorisation. Read the clinic registration guide and the biomedical waste guide.
If it goes wrong
- Application rejected. Gujarat's rules say the officer must give reasons. You then apply again once you meet them.
- Notice received. In Maharashtra the notice says what to fix and by when. Act within the time given. Ignoring it can lead to sealing.
- No NOC yet, but you want NABH accreditation. NABH asks for proof that you applied. You must also write to the fire department at least every three months. NABH accepts a third-party certificate valid for one year. It does not replace the NOC.
- Lost certificate. Write to the fire office that issued it. Most portals let you download it again.
- Unsure about your category. Write to your fire office with height, floors, floor area and use. Ask for the answer in writing.
After the paperwork
Patients should find your correct address and timings. A free clinic page from VisiDx can carry them. Set up my digital clinic.
Sources
All pages were read on 30 Oct 2026. Dates are those the source gives.
- BIS, National Building Code of India 2016, Part 4: 2016. The copy is hosted by a municipal corporation. Clauses used: clause 1.2 (what Part 4 covers), clause 2.6 (how height is measured), clause 2.38 (high-rise buildings) and clauses 3.1.4 and 3.1.6 (hospitals and nursing homes are Group C-1, doctors' offices are Group E-1 and outpatient clinics are Group E-2).
- Delhi Fire Service, Rules 2010 and FAQs: undated. Rule 27 lists the buildings with a fire risk.
- NABH, Delhi notification: 11 Mar 2025. NABH, advisory: 20 Sep 2022. NABH, clarification: undated.
- MHA (DGCD), fire safety audit checklist for hospitals and nursing homes: 2024. It sorts hospitals into four height and plot categories and asks for a valid fire safety certificate. It is an audit checklist, not a licensing rule.
- Maharashtra, Fire Prevention and Life Safety Measures Act, 2006: gazette copy of 2007. Section 3 (certificates from the owner or occupier), section 6 (notice) and sections 7 and 8 (steps, including sealing, if a notice is ignored).
- Gujarat, Fire Prevention and Life Safety Measures Regulations, 2023: notified 11 Dec 2023, gazette 13 Dec 2023. The list of buildings that must apply is in the Third Schedule of the Rules.
- Delhi High Court, order of 1 June 2024: W.P.(C) 8381/2024. It records the petitioner's reading of rules 27 and 28.
- Portals: Delhi, Maharashtra, Gujarat, Rajasthan, UP, Tamil Nadu, West Bengal, Telangana, Bihar, Karnataka.
Not legal advice. Fire rules are made by states and cities, and they change. Open your fire service's page before you act. VisiDx is not part of any fire service or government body.
Last checked 30 Oct 2026.
